
Using EC-17, EC-30 & EC-30T Diagnostic Options
NEXIQ Brake-Link™ Bendix
®
& Eaton
®
ABS Applications 61
5 Next, Brake-Link™ displays the
Special Test
menu; use the and
keys to select
TEST RETARDER RELAY
and press .
6 If this is the first
special test
performed since you entered the
Special
Test
menu, Brake-Link™ configures the ECU for test mode. It remains
in test mode until you exit the
Special Test
menu.
7 Brake-Link™ presents the status of the lamp.
Select CONTINUE and press to turn the retarder relay on/off.
8 Use the and keys to select EXIT and press to
return to the
Special Test
menu.
9 Press to return to the
EC-17/30/30T Diagnostic Options
menu or
press to return to the
Select Application
screen.
Load Battery Voltage Test
This test monitors the battery voltage drop while exhausting all modulators at
the same time for a period of 3 seconds.
Note:
This test supports EC-30 and EC-30T.
The rest of this section describes running this test with each navigation meth-
od.
To run a Load Battery Voltage Test
via menu navigation
:
1 Connect Brake-Link™ to the tractor or trailer and power-up (see “Con-
necting Brake-Link™ Components”, on page 20).
2 Register the ECU (see “Register ECU via menu navigation:”, on
page 28).
RETARDER RELAY
ON
[CONTINUE] EXIT
Comentários a estes Manuais